Material and Construction Optimization for Prevention of Premature Pavement Distress in PCC Pavements, Phase 3
Principal Investigator:Jim Grove,
jimgrove@iastate.edu (
other projects)
Project Status: In Progress
Start Date: 08/01/2006
End Date: 12/31/2007
Research Objective: Phase III will refine and finalize lab and field tests based on the data obtained from the shadow construction projects conducted in Phase II. Two additional field construction projects will be evaluated to further refine and check the test data in two very different state projects, New York and South Dakota.
The deliverable of this phase will be a guide for both agency and contractor personnel. This will outline a suite of tests that will characterize material properties and concrete properties in order to assure long term durability through real time testing. Details from individual tests wil be provided, including why the tests should be run, when they should be used, what information they supply, and necessary particulars of the test itself.
*To read pdf files, you may need to download the free
Adobe Acrobat Reader.