Department of Civil, Construction, and Environmental Engineering

Project Details

Evaluation of Rumble Strips on Low-Volume Rural Roads in Iowa


Principal Investigator:

Shauna Hallmark, shallmar@iastate.edu (other projects)

Co-Principal Investigator:

Project Status: In Progress

Start Date: 11/01/2007
End Date: 12/31/2008


Research Objective: The objectives of this project are to investigate the economic and physical feasibility of installing narrow rumble strips along the edge of selected paved secondary roads in Iowa. A painted edge line will be placed directly over the rumble strips, thus providing anticipated improved longevity and wet-weather visibility of the paint. Evaluation of reduced run-off and drift-off crashes will be undertaken as well as enhanced performance of the painted edge lines.

*To read pdf files, you may need to download the free Adobe Acrobat Reader.