Two-Lift Concrete Pavements to Meet Public Needs (Proj. 8)
Principal Investigator:James K. Cable,
jkcable@iastate.edu (
other projects)
Co-Principal Investigator: Student Researchers: Other Authors: Daniel P. Frentress, Rob Baker
Project Status: In Progress
Start Date: 10/01/2003
End Date: 09/30/2004
Reports: Related Publications:Research Objective: The report reviews the past work in the United States and internationally in the development of two-lift pavements. It points out the strengths and limitations in the construction of such portland cement concrete pavements. Certain cost, mix design, and construction problems are inhibiting the growth of this product. Changes in the availability of aggregates, knowledge of materials and new construction equipment, and the desire for specific surfaces to meet noise, durability, and safety are prompting the need to reconsider this type of construction.